Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Product Details
Customization: Available
After-sales Service: Provide Technical Support Throughout The Process
Warranty: <10year

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 5 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 3 Self-brands, check the Audit Report for more information
National Award received
This supplier had received national award, you can check the Audit Report for more information
to see all verified strength labels (24)
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
  • Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Find Similar Products
  • Overview
  • Our Advantages
  • Core Technology
  • Detailed Photos
  • Company Profile
  • Some case studies
  • FAQ
Overview

Basic Info.

Model NO.
LAT-01
Certification
ISO9001, CE
Application
Industry
Voltage
380V
Disinfection Method
Ozone
Dielectric Material
Glass Tube
Cooling Method
Water-Cooling
Gas
Oxygen
Frequency
400-1000Hz
Type
Electrolytic Type
Ozone Capacity
10kg/H
Transport Package
Wooden Packaging
Specification
3400*1000*2200mm
Trademark
LONGANTAI
Origin
Weifang, Shandong, China
HS Code
8543709990
Production Capacity
20000

Product Description

 Process dvantages

Pretreatment: Pretreatment reduces pollution concentration, balances water quality, opens and breaks chains, removes toxicity, and improves the biodegradability of wastewater, so that biochemical energy can operate better.

Biochemical treatment system: The pretreatment system reduces the operating load of the biochemical treatment system, saves energy efficiently, and accurately controls the treatment effect and operating costs of each unit.

Deep treatment: The final drainage is deeply oxidized through applicable catalytic oxidation technology to meet the national emission standards.
 

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
1. High Efficiency
a. High-efficiency discharge tube
Micro-gap double-layer discharge
HMS Patented design hexagon conductive plate
2.Ozone catalytic oxidation reactor

The ozone catalytic oxidation reactor is mainly composed of the reactor main shell, proprietary tower components and proprietary ozone catalyst filler. The proprietary tower components achieve efficient mixing of ozone gas and wastewater, combined with the patented ozone catalyst series products developed by our company, to improve the utilization rate of ozone.
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
3. Electrocatalytic Advanced Oxidation 

BDD electrodes can effectively degrade pollutants in various types of organic wastewater, such as organic wastewater from pharmaceutical/pesticide chemicals, petrochemicals, coking, smelting, printing and dyeing, papermaking, leather making, explosives, wine making, and landfill leachate.

(1) Phenols and their derivatives, such as phenol, mainly come from petrochemical companies;
(2) Pharmaceutical intermediates, such as 17β-estradiol, mainly come from pharmaceutical chemical companies;
(3) Dyes and pigments, such as methyl orange, mainly come from printing and dyeing factories;
(4) Herbicides and pesticides, such as chlorsulfuron, mainly come from pesticide manufacturers;
(5) Surfactants, such as car wash wastewater.

 

4. Fenton Advanced Oxidation

By adopting this reactor system, most of the Fe3+ produced by the Fenton process is attached to the surface of the Fenton carrier in the fluidized bed in the form of crystals. The crystallized Fe3+ iron salt forms a synergistic effect with the Fenton system and is converted into Fe2+ over and over again. This can greatly reduce the amount of chemical sludge produced by the dosage of the traditional Fenton process, reduce the amount of H2O2 added by more than 20%, the amount of Fe2+ added by more than 50%, and the amount of sludge by more than 40%, effectively increasing the COD removal rate by more than 10%, and saving 30% to 50% of the treatment and operation costs.
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Our Advantages


10,000 square meters of water treatment filler production workshop
20,000 square meters of high-end environmental protection equipment production workshop

4000 square meters large open laboratory
More than 30 productive experimental bases
More than 40 pilot systems
More than 50 small pilot test devices
More than 60 large instruments and equipment
More than 50 petents 
More than 18 years of experience
Top 5 position of environmental protection technology industry in China.

Core Technology

 

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Detailed Photos

   
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Company Profile


Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

Some case studies

1. Chemical/pharmaceutical/industrial park comprehensive wastewater pretreatment and upgrading

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

2. Coal chemical wastewater treatment
 

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

3. Petrochemical energy wastewater treatment
 

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

4.  Dye/pigment wastewater treatment

Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment


5.  Pesticide wastewater treatment
Advanced Oxidation, Chemical Park Wastewater Treatment, Wastewater Advanced Treatment

FAQ

1.Q: Where is your company? How can I visit there?
   A:The company is located in CaiFu International, Kuiwen District, Weifang City, Shandong Province, China. It is about an hour's drive from Qingdao Airport and Weifang Railway Station. If you need it, we can come and pick you up. Welcome to visit our company.
 
2.Q:Do you have minimum order quantity request?  
   A:No minimum order, but it can get a discount if you order a large quantity.


3.Q:Do you have certificates?
   A:Yes,we have ISO,SGS certificate.


4.Q:Can you meet my special requirements for the product?
   A:Yes,we have a professional design team.We can provide drawings according to your requirements.


5.Q:How to buy your idea products?
   A:You can provide us your water or waste sources,water or waste quality,flow rate and ground area (connect us for more details) 


6.Q:How to pay?
   A:T/T and L/C are acceptable and T/T will be more appreciated 30% deposit before producing,70% balance before loading by T/T.


7.Q:What is the delivery time ?
A: It depends on order quantities .Generally speaking ,the delivery time will be within 2 to 4 weeks.


8.Q:How to pack the products?
  A:We use standard package .If you have special package requirements ,we will pack as required ,but the fees will be paid by customers.


9.Q:How to install after the equipment arriving destination?
   A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee ,air tickets ,accommodation, wages will be paid by buyers. 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier