Customization: | Available |
---|---|
After-sales Service: | on-Line or on Site Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
INTRODUCTION
1. Concentration: When the spiral push shaft rotates, the multiple solid and active laminations located on the periphery of the push shaft move relative to each other. Under the action of gravity, water is filtered out from the gaps between the relatively moving laminations, achieving rapid concentration.
2. Dehydration: The concentrated sludge continues to move forward with the rotation of the spiral shaft; along the direction of the mud cake outlet, the pitch of the spiral shaft gradually becomes smaller, the gap between the rings also gradually becomes smaller, and the volume of the spiral cavity becomes smaller. Continuously shrinking; under the action of the back pressure plate at the outlet, the internal pressure gradually increases. Driven by the continuous operation of the spiral push shaft, the water in the sludge is extruded and discharged. The solid content of the filter cake continues to increase, and finally the sludge is realized. of continuous dehydration.
3. Self-cleaning: The rotation of the spiral shaft drives the moving ring to continuously rotate. The equipment relies on the movement between the fixed ring and the moving ring to achieve a continuous self-cleaning process, thereby cleverly avoiding the common clogging problem of traditional dehydrators.
ADVANTAGES
It can directly process the sludge in the aeration tank or the sludge in the secondary sedimentation tank. There is no need to set up a sludge concentration tank and storage tank, saving space.
Improve the phosphorus removal function of the system: The sludge is dehydrated under aerobic conditions, avoiding the release of sludge phosphorus under anoxic or anaerobic conditions, and improving the dephosphorus function of the system.
Simple operation and management: There are no filter cloths, filter holes and other easily clogged components, making the operation safe and simple. Combined with the fully automatic dosing system, it can achieve 24-hour unattended operation.
Reduce system processing load: integrated sewage and sludge treatment to reduce the burden on subsequent biochemical reactors.
APPLICATION FIELDS
1. Suitable for sludge in municipal sewage, food, beverage, chemical, leather, welding materials, papermaking, printing and dyeing, pharmaceutical and other industries.
2. Suitable for dehydration of high and low concentration sludge. When dehydrating low-concentration (2000mg/L~) sludge, there is no need to build a concentration tank or a storage tank, which reduces construction costs, reduces the release of phosphorus and the generation of anaerobic ozone.
National high-tech enterprises
The "little giant" of specialized and sophisticated enterprises national
Specialized and sophisticated enterprises that produce new and unique products of Shandong province
Shandong gazelle enterprise
Shandong province research and development center
Shandong Industrial Design Center
Hidden champions
ISO9001 quality system certification enterprise
ISO45001 Occupational health and safety management system certification enterprise
ISO14001 environmental management system certification enterprise
More than 50 invention patents and 10 utility model patents granted
CASE INFERENCE
1. Chemical/pharmaceutical/industrial park comprehensive wastewater pretreatment and upgrading
2. Coal chemical wastewater treatment
3. Petrochemical energy wastewater treatment
4. Dye/pigment wastewater treatment
5. River water quality improvement
6. Pesticide wastewater treatment
7. Reverse osmosis membrane concentrated water treatment
8. Leather waste water treatment
9. Total treatment technology of landfill leachate
10. Electroplating wastewater treatment
3.Q:Do you have certificates?
A:Yes,we have ISO,SGS certificate.
4.Q:Can you meet my special requirements for the product?
A:Yes,we have a professional design team.We can provide drawings according to your requirements.
5.Q:How to buy your idea products?
A:You can provide us your water or waste sources,water or waste quality,flow rate and ground area (connect us for more details)
6.Q:How to pay?
A:T/T and L/C are acceptable and T/T will be more appreciated 30% deposit before producing,70% balance before loading by T/T.
7.Q:What is the delivery time ?
A: It depends on order quantities .Generally speaking ,the delivery time will be within 2 to 4 weeks.
8.Q:How to pack the products?
A:We use standard package .If you have special package requirements ,we will pack as required ,but the fees will be paid by customers.
9.Q:How to install after the equipment arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee ,air tickets ,accommodation, wages will be paid by buyers.